From Unfinished to Fully Finished
This room started as an unfinished space with exposed framing and no insulation or drywall. Insulation was installed first, followed by drywall on the walls and sloped ceiling to create a clean, defined structure. The walls and ceiling were then finished with fresh light beige paint that brightened and warmed the room.
Dark LVP flooring was added to provide contrast and durability, and dark shoe mouldings were installed to give the room a clean and finished look. Custom built in multi tiered storage steps were constructed to increase functionality. New recessed lighting was also added to provide modern and even illumination.
The transformation is now complete, turning the previously unfinished room into a polished, functional, and ready to use space.













Contact Us
Questions about your home renovation? Reach out!

© 2025. All rights reserved.
info@bandoremodeling.com
571 . 420 . 3526
License: 2705196954
If We Work Then
It Looks Good
Contact
Legal
Credientials
Find us
B&O Remodeling


Areas We Serve